Jharkhand Solar  Policy

Jharkhand introduced a solar energy policy in 2022, which will be applicable till 2027. The state government has made provisions for

Residential Sector

Commercial/Open Access Projects

Manufacturing Equipment

Land Development/ Allocation

Target: 4 GW
Implementing Agency: JREDA

 Residential

Target: 250 MW

  • Height of the module structure (max 3 m) carrying solar panels will not be counted towards the total height of the building
  • Mandatory for all residential plots with a total plot area of more than 500 square yards to install solar
  • Virtual Net Metering (VNM), and Group Virtual Net Metering to be promoted
  • Additional subsidy for consumers with income below 3lakh per annum

            1-3kW: 60% of project cost

             3-10kW: 80% of project cost

               Subsidy Structure:

Go Solar in Just 4 Hours with Ojas Solution

Commercial/ Open Access

  • Solar power plant to be treated as industrial activity
  • Electricity duty shall be exempted/reimbursed for 5 years from the commercial operation date for rooftop solar plants
  • 100% exemption from transmission and wheeling charges for 10 years
  • Exemption from cross – subsidy and additional charge – for park set up for third party sale within the state (less than 25 MW) and captive solar projects through open access.

          Banking Charges

  • Banking of 100% of energy shall be permitted during all 12 months of the year
  • Banking charges shall be exempted for grid-connected rooftop solar projects and shall be adjusted in kind @ 5% of the energy delivered at the point of drawl.
  • Drawls from banked energy shall not be permitted during the five (5) month period from 1st April to 30th June and 1st February to 31st March of each financial year.
  • The unutilized banked energy shall be considered as deemed purchase by DISCOMs at 50% of the Average Pooled Power Purchase Cost as determined by the JSERC for the applicable year. Energy settlement shall be done on a monthly basis.
Embrace the Future with a Roof Made of Solar Panels!

 Manufacturing

  • Electricity duty to be waived for the new manufacturing facilities and ancillaries of the Solar Power Projects for 5 years
  • 100% exemption/reimbursement on stamp duty.
  • Net SGST reimbursement
  • 100% reimbursement of custom duty on input required for manufacturing the solar modules and battery storage for a period of 5 years.

Land Development /Allocation

  • All government departments shall share information on waste or unused land with JREDA
  • All identified land parcels will be converted into a land bank for solar deployment.
  • JREDA to float an ‘Expression of Interest (EoI)’ for private landowners who wish to offer their lands for sale or on lease
  • 100% exemption of stamp duty on lease deed of land or purchase of land for setting up solar plant
  • 100% waiver on land use conversion charges/fees
  • The solar power producer must set up the Solar Plant within a period of two years from the date of allotment of land
  • The land shall be allotted for a period of 30 years and up to a maximum period of 40 years upon extension.

         Land Availability According to Projects

Get all Your Solar Equipment at One Place

Our Products

Our Products

ornate solar

Ornate InRoof
Smart Roof Solution

ornate solar

Ornate Assured
Solar Accessories

ornate solar

Ojas
Elevated Rooftop Solar Solution

Request A Quote

Our engineers will not only provide you with a perfect quote but also help you with their technical expertise 😃 so partner with Ornate to build better & more efficient Solar projects.

    Your Name *

    Phone Number *

    Email Address*

    Organization

    Requirement

    Latest Solar Updates from Jharkhand

    Read More
    Go to Top