Residential
Target: 250 MW
- Height of the module structure (max 3 m) carrying solar panels will not be counted towards the total height of the building
- Mandatory for all residential plots with a total plot area of more than 500 square yards to install solar
- Virtual Net Metering (VNM), and Group Virtual Net Metering to be promoted
- Additional subsidy for consumers with income below 3lakh per annum
1-3kW: 60% of project cost
3-10kW: 80% of project cost
Subsidy Structure:
- Solar power plant to be treated as industrial activity
- Electricity duty shall be exempted/reimbursed for 5 years from the commercial operation date for rooftop solar plants
- 100% exemption from transmission and wheeling charges for 10 years
- Exemption from cross – subsidy and additional charge – for park set up for third party sale within the state (less than 25 MW) and captive solar projects through open access.
Banking Charges
- Banking of 100% of energy shall be permitted during all 12 months of the year
- Banking charges shall be exempted for grid-connected rooftop solar projects and shall be adjusted in kind @ 5% of the energy delivered at the point of drawl.
- Drawls from banked energy shall not be permitted during the five (5) month period from 1st April to 30th June and 1st February to 31st March of each financial year.
- The unutilized banked energy shall be considered as deemed purchase by DISCOMs at 50% of the Average Pooled Power Purchase Cost as determined by the JSERC for the applicable year. Energy settlement shall be done on a monthly basis.
Manufacturing
- Electricity duty to be waived for the new manufacturing facilities and ancillaries of the Solar Power Projects for 5 years
- 100% exemption/reimbursement on stamp duty.
- Net SGST reimbursement
- 100% reimbursement of custom duty on input required for manufacturing the solar modules and battery storage for a period of 5 years.
Land Development /Allocation
- All government departments shall share information on waste or unused land with JREDA
- All identified land parcels will be converted into a land bank for solar deployment.
- JREDA to float an ‘Expression of Interest (EoI)’ for private landowners who wish to offer their lands for sale or on lease
- 100% exemption of stamp duty on lease deed of land or purchase of land for setting up solar plant
- 100% waiver on land use conversion charges/fees
- The solar power producer must set up the Solar Plant within a period of two years from the date of allotment of land
- The land shall be allotted for a period of 30 years and up to a maximum period of 40 years upon extension.
Land Availability According to Projects
Request A Quote
Our engineers will not only provide you with a perfect quote but also help you with their technical expertise 😃 so partner with Ornate to build better & more efficient Solar projects.
Latest Solar Updates from Jharkhand
Jharkhand to Install 2,500 Solar-Powered Water Pumps Under PM-Kusum Yojana
Highlights: JREDA to install 7HP solar water pumps in the state under PM Kusum scheme Jharkhand is
Jharkhand’s New Solar Policy Aims to Generate 4000 MW in the Next 5 years
Jharkhand government has set a target of generating 4000 MW of solar energy in the next five
India’s Hopes to Replace Diesel with Renewable Energy in Farms Rides on Solar, Mostly
India's ambitions to switch from diesel to renewable energy for its farming sector have been making headlines.